Crane Track Length L: m
S: m
SA: m
HC: m
HS: m
HO: m
HG: m
Single Girder Overhead Travelling Crane: kg
Double Girder Overhead Travelling Crane: kg
Single Girder Wall Travelling Crane: kg
Underslung Girder Overhead Travelling Crane: kg
YesNoPlease offer crane trackPlease offer conductor system
Track length: m
Distance between supports: m
Advice by telephoneABUS offerPlanning documentation with detailed technical data
Company:
Address:
Town/City:
Post Code:
Contact name:
Position:
Phone no:
Fax no:
Email:
Website:
Girder Type: m
Girder Size: m
Details of Wire Rope Hoist required
Type/Load Capacity
EUS
Model in acc. With selection table: :
Load Capacity ( SWL):
kg
Lifting Speed:
m/min
FEM Group:
Hook Path:
m
DDADQAZZA
Model in acc. With selection table:
Reeving:
Cross Travel Speed:
Operating Voltage:
V Hz
Control Voltage:
Quantity:
Load Capacity: kg
ABU Compact GMC load capacity up to 200 kgABU Compact GM2 load capacity up to 630 kgABU Compact GM4 load capacity up to 1250 kgABU Compact GM6 load capacity up to 2500 kgABU Compact GM8 load capacity up to 4000 kg
Hook Path: m
What lifting speeds do you need?:
High lifting speeds because of long hook path and frequent usePrecise lifting and lowering more important than speedPlease provide advice
What operating voltage is available?:
3 x 380 V / 50 HzOther
V/
Hz
Do you need to move the load along a girder ?:
no (stationary use)yes, with push trolley (push-pull operation)yes, with electric trolley (electric operation)
Yes
length: mm
height: mm
flange width BPR: mm
type of profile:
No
Is a power supply system required ?:
NoYes, I am interested in
a festoon system (max. travel 30 m)a protected conductor (for longer travel or more than one hoist on one girder)please provide advice
If you prefer a festoon system, do you need a mobile control carrier ?:
YesNoPlease provide advice
1. Jib length:
mm
2. Capacity:
3. Highest hook position:
4. Clear building height:
5. Height of lower edge of jib:
Type of mounting required: (please tick as appropriate):
on foundation with anchor botson reinforced concrete floor plateon reinforced concrete ceiling
Slewing gear:
push-pullpoweredon reinforced concrete wall
Trolley:
Push-pullPowered
Who will install the crane?:
ABUS ServiceCustomer
Implementation time frame:
Short TermMedium TermLong Term (Investment Planning)