Project Description
Client: | DESCON Engineering |
---|---|
Project: | New Heavy Vessel Fabrication Facility |
Location: | Hamriyah FZ, Phase 1, Sharjah |
Project Details: | Design, manufacture, supply, install, test and commission 2 off ABUS double girder cranes for handling fabricated pressure vessels weighing up to 160 tonnes |
Capacity: | 100 tonnes main hoist, 10t aux hoist |
Span: | 29 Metres |
Height of Lift: | 12 Metres |
Comments: | Cranes designed for using radio control with optional control of cranes independently or in tandem. |